Scroll to top
transportation

New Bedford Regional Airport Terminal Building Assessment

The New Bedford Regional Airport (EWB) is a Primary Service Airport, composed of runways, taxiways, aircraft parking aprons, hangars, maintenance facilities, and a terminal building. Saam completed a MADOT-funded Terminal Building Assessment in conjunction with Airport Solutions Group, who finalized the Airport Master Plan update in 2013. Saam evaluated the existing terminal conditions in parallel with the long term needs of a commercial passenger airport.

The results will aid in the determination of the best strategy moving forward—whether the existing terminal building be rehabilitated, reconstructed in place, or be totally replaced with a new structure. The study included structural, mechanical, electrical, and plumbing (MEP), compliance with building and accessibility codes, and architectural elements to determine the current condition and remaining life expectancy of the existing building’s major components.

  • Location:

    New Bedford, MA

  • Completion:

    2016

  • Size:

    12,400 sf